New £6.8 million swimming pool approved for Brighton

New £6.8 million swimming pool approved for Brighton

Plans for a new community swimming pool at Withdean Sports Complex have been given the green light, with building work due to start in spring next year.

Members of the council’s planning committee voted unanimously to approve plans for the 5-lane, 25m community pool – the first new publicly funded swimming pool built in the city for around 40 years.

The new swimming pool has been designed to reduce environmental impact, support local biodiversity and create a healthy, energy-efficient building for future generations.

Sustainability features include:

– new planting and wildlife-friendly landscaping
– roof-mounted solar panels
– using sustainable materials
– high levels of insulation
– low-energy (LED) lighting systems
– air source heat pumps
– water-saving technologies such as microfiltration

The pool will also be accessible and inclusive, enabling more people to enjoy the physical and mental health benefits of swimming. The design includes:

– ramped and stair access
– a pool pod lift and walk-in steps
– accessible toilets and showers (including a hoist)
– changing rooms including a wheelchair accessible changing and family sized cubicles
– designated wheelchair spaces in the spectator area

The £6.8 million project will be funded from a combination of section106 developer contributions and capital borrowing.

Read more here

Share:

Facebook
Twitter
Pinterest
LinkedIn